Do you have any tips on the air line positioning?

Hydor recommend that the airline is secured using the small suckers provided. Positioning of the Red flow control at the end of the airline is very important. Hydor recommend that the Red flow control is fitted around 10cm above the water level, this may mean that the airline tubing has to be cut.

Contact Us

Not finding what you're looking for? Contact Us Directly